Tabellab

Lessons in this course

  1. Where the Stock Sits: Weeks of Cover Across the NetworkLabFree
  2. Network & Lead Times: Cumulative Lead Time per DepotLab Locked
  3. Installation vs Echelon Stock & Inventory PositionLab Locked
  4. Base-Stock Levels: Order Up to Review + Lead TimeLab Locked
  5. Risk Pooling: Local vs Central Safety StockLab Locked
  6. When Demand Moves Together: Pooling with CorrelationLab Locked
  7. Where to Hold Safety Stock: DC, Depots or SplitLab Locked
  8. Time-Phased Distribution Plan for One DepotLab Locked
  9. DC Requirements: Rolling Up the Depot ShipmentsLab Locked
  10. Fair Share in a Shortage: Equal Weeks of CoverLab Locked
  11. Transshipments: Moving Stock Between DepotsLab Locked
  12. Push vs Pull: Pushing a Receipt or Refilling to Base StockLab Locked
  13. Service per Echelon: Fill Rate at the DC and DepotsLab Locked
  14. Lead-Time Variability in Safety StockLab Locked
  15. Stocking Policy by Class: Central or LocalLab Locked
  16. Centralising Slow Movers: Express Cost vs Holding SavingLab Locked
  17. Stock Value per Echelon & Pipeline StockLab Locked
  18. One Depot More or Less: Pooled Safety StockLab Locked
  19. Network KPIs: Fill Rate, Turns & Excess StockLab Locked
  20. Final Project: The Network Stock DashboardLab Locked