Multi-Echelon Inventory by the Numbers: Echelon Stock, Base-Stock Levels, Risk Pooling, Central vs Local Safety Stock, Distribution Plans, Fair Shares, Transshipments & a Dashboard
Plan stock for a fictional central DC and four depots in 20 hands-on labs – weeks of cover, echelon stock, base-stock levels, risk pooling with and without correlation, safety stock placement, distribution plans, fair shares, transshipments and a network dashboard – with every cell checked as you go.
- One-time payment
- Instant access right after payment
- Secure checkout with Stripe
About this course
In this course you plan stock for a fictional tool distributor with one central DC and four depots. You measure weeks of cover per location, build cumulative lead times, separate installation from echelon stock and set base-stock levels with z values from a given table. You calculate how much safety stock risk pooling saves with independent demand and with a given correlation, compare where to hold the buffer, and build time-phased distribution plans for a depot and the DC with lead-time offsets via INDEX. You split a shortage with equal weeks of cover, decide transshipments, compare push and pull, add lead-time variability, value pipeline stock and finish with a network dashboard.
Why learn with Tabellab
- Practise in a real spreadsheetEvery lab runs in your browser and checks your cells instantly.
- Verifiable certificatePass the final exam and get a certificate with a public verification code.
- Try before you buyLesson 1 is free, with no sign-up or card needed.
- Who is behind TabellabBuilt by Babala Software in Füllinsdorf, Switzerland. Questions? hello@tabellab.com · Imprint
Lessons
- Where the Stock Sits: Weeks of Cover Across the NetworkFree
- Network & Lead Times: Cumulative Lead Time per Depot Locked
- Installation vs Echelon Stock & Inventory Position Locked
- Base-Stock Levels: Order Up to Review + Lead Time Locked
- Risk Pooling: Local vs Central Safety Stock Locked
- When Demand Moves Together: Pooling with Correlation Locked
- Where to Hold Safety Stock: DC, Depots or Split Locked
- Time-Phased Distribution Plan for One Depot Locked
- DC Requirements: Rolling Up the Depot Shipments Locked
- Fair Share in a Shortage: Equal Weeks of Cover Locked
- Transshipments: Moving Stock Between Depots Locked
- Push vs Pull: Pushing a Receipt or Refilling to Base Stock Locked
- Service per Echelon: Fill Rate at the DC and Depots Locked
- Lead-Time Variability in Safety Stock Locked
- Stocking Policy by Class: Central or Local Locked
- Centralising Slow Movers: Express Cost vs Holding Saving Locked
- Stock Value per Echelon & Pipeline Stock Locked
- One Depot More or Less: Pooled Safety Stock Locked
- Network KPIs: Fill Rate, Turns & Excess Stock Locked
- Final Project: The Network Stock Dashboard Locked
Learner reviews
Be the first to review this course.