Tabellab
Industry Finance Intermediate

Manufacturing Metrics: OEE, Capacity & Takt Time

Measure OEE by shift and the six big losses, balance a line to takt, find the bottleneck, read MTBF and MTTR, cost SMED, scrap and rework, and plan capacity against demand – every cell checked as you go.

8 lessons 8 labs 2 h Certificate

The first lesson is free — no account needed.

About this course

A manufacturing metrics course that runs one moulding plant's numbers in a spreadsheet, for production engineers, plant controllers and operations students. You split a day on a moulding press into availability, performance and quality per shift and pool the day's OEE correctly, turn a week of press data into the six big losses, work out takt time, cycle time and how well a line is balanced, find the true bottleneck from cycle times, OEE and shift patterns, turn a breakdown log into MTBF, MTTR and availability, measure the press time SMED frees up and how it shrinks the economic batch size, cost scrap and rework with first-pass and rolled throughput yield and decide month by month between base capacity, overtime and a second shift. The first lab is free.

Lessons

  1. OEE by Shift: Availability, Performance and QualityLab15 minFree
  2. The Six Big Losses: Where the OEE Minutes GoLab15 min Pro
  3. Takt Time, Cycle Time and Line BalancingLab16 min Pro
  4. Bottleneck and Effective Capacity per Day and WeekLab15 min Pro
  5. MTBF, MTTR and Availability from a Breakdown LogLab14 min Pro
  6. SMED Changeover Reduction and Economic Batch SizeLab15 min Pro
  7. Scrap and Rework Cost, First-Pass Yield and Rolled Throughput YieldLab14 min Pro
  8. Capacity Plan vs Demand Forecast: Overtime or a Second Shift?Lab16 min Pro