Tabellab
Read first

Write it down before the start

  • Hypothesis, primary metric, guardrails, MDE, significance level, power and duration go into the plan before the test starts.
  • Pick one primary metric. With five "primary" metrics, one of them will look like a win by chance.
  • Relative vs absolute: 3.00% → 3.24% is +8% relative but +0.24 pp absolute. Always say which one you mean.
Loading the spreadsheet…