Tabellab

Build-to-Rent Development by the Numbers: Unit Mix, Development Budgets, Construction Draws, Lease-Up Curves, Stabilised NOI, Yield on Cost, Exit Values & a Build-to-Rent Dashboard

Work through 20 hands-on labs as the appraisal team of a fictional 120-flat rental scheme – set the unit mix and rents, build the development budget, fund the construction draws, model the lease-up, reach stabilised NOI, compare yield on cost with the exit cap rate, test rents and costs, calculate the unlevered IRR and finish with a build-to-rent dashboard – with every cell checked as you go.

20 lessons 20 labs Certificate

  • One-time payment
  • Instant access right after payment
  • Secure checkout with Stripe

About this course

In 20 hands-on spreadsheet labs you appraise a fictional 120-flat build-to-rent scheme from first sketch to investment committee. You set the unit mix, net-to-gross efficiency and rents from comparables, add other income and build the development budget from quantities and rates. You spread construction spend along an S-curve, fund it equity first, roll up the loan interest and model the lease-up with concessions and the NOI gap. Later labs cover operating costs, the stabilised NOI bridge, yield on cost against the exit cap rate, exit values, amenity payback with PMT, rent and cost sensitivity, the unlevered IRR, risk scenarios and a final dashboard.

Why learn with Tabellab

  • Practise in a real spreadsheetEvery lab runs in your browser and checks your cells instantly.
  • Verifiable certificatePass the final exam and get a certificate with a public verification code.
  • Try before you buyLesson 1 is free, with no sign-up or card needed.
  • Who is behind TabellabBuilt by Babala Software in Füllinsdorf, Switzerland. Questions? hello@tabellab.com · Imprint

Lessons

  1. Ashby Fold at a Glance: Does the Rental Scheme Pay?LabFree
  2. Unit Mix: Net Area, Gross Area and EfficiencyLab Locked
  3. Rent by Unit Type: Comparables and Rent per m²Lab Locked
  4. Other Income: Parking, Storage and Amenity FeesLab Locked
  5. Development Budget: Land, Hard Costs, Soft Costs, ContingencyLab Locked
  6. Construction Draws: The S-Curve and Monthly SpendLab Locked
  7. Funding the Build: Equity First, Then the LoanLab Locked
  8. Interest During Construction: The Monthly Roll-UpLab Locked
  9. Lease-Up Curve: Units Let and Occupancy by MonthLab Locked
  10. Concessions: Free Weeks and Net Effective RentLab Locked
  11. Lease-Up Cash Flow: Rent Collected and the NOI GapLab Locked
  12. Operating Costs per Unit and the Management FeeLab Locked
  13. Stabilised NOI: The Bridge from Gross RentLab Locked
  14. Yield on Cost vs Exit Cap Rate: The Development SpreadLab Locked
  15. Exit Value and Profit on Cost at Different Cap RatesLab Locked
  16. Amenity Spend vs Rent Premium: Annualised with PMTLab Locked
  17. Sensitivity Table: Rent × Build CostLab Locked
  18. Cash Flow and the Unlevered IRRLab Locked
  19. Risk Scenarios: Cost Overrun, Lower Rents and DelayLab Locked
  20. Final Project: The Build-to-Rent DashboardLab Locked

Learner reviews

Be the first to review this course.

Write a review

Your rating

Reviews are checked before they appear. By submitting you confirm the images are yours and may be shown on this page. Privacy