Build-to-Rent Development by the Numbers: Unit Mix, Development Budgets, Construction Draws, Lease-Up Curves, Stabilised NOI, Yield on Cost, Exit Values & a Build-to-Rent Dashboard
Work through 20 hands-on labs as the appraisal team of a fictional 120-flat rental scheme – set the unit mix and rents, build the development budget, fund the construction draws, model the lease-up, reach stabilised NOI, compare yield on cost with the exit cap rate, test rents and costs, calculate the unlevered IRR and finish with a build-to-rent dashboard – with every cell checked as you go.
- One-time payment
- Instant access right after payment
- Secure checkout with Stripe
About this course
In 20 hands-on spreadsheet labs you appraise a fictional 120-flat build-to-rent scheme from first sketch to investment committee. You set the unit mix, net-to-gross efficiency and rents from comparables, add other income and build the development budget from quantities and rates. You spread construction spend along an S-curve, fund it equity first, roll up the loan interest and model the lease-up with concessions and the NOI gap. Later labs cover operating costs, the stabilised NOI bridge, yield on cost against the exit cap rate, exit values, amenity payback with PMT, rent and cost sensitivity, the unlevered IRR, risk scenarios and a final dashboard.
Why learn with Tabellab
- Practise in a real spreadsheetEvery lab runs in your browser and checks your cells instantly.
- Verifiable certificatePass the final exam and get a certificate with a public verification code.
- Try before you buyLesson 1 is free, with no sign-up or card needed.
- Who is behind TabellabBuilt by Babala Software in Füllinsdorf, Switzerland. Questions? hello@tabellab.com · Imprint
Lessons
- Ashby Fold at a Glance: Does the Rental Scheme Pay?Free
- Unit Mix: Net Area, Gross Area and Efficiency Locked
- Rent by Unit Type: Comparables and Rent per m² Locked
- Other Income: Parking, Storage and Amenity Fees Locked
- Development Budget: Land, Hard Costs, Soft Costs, Contingency Locked
- Construction Draws: The S-Curve and Monthly Spend Locked
- Funding the Build: Equity First, Then the Loan Locked
- Interest During Construction: The Monthly Roll-Up Locked
- Lease-Up Curve: Units Let and Occupancy by Month Locked
- Concessions: Free Weeks and Net Effective Rent Locked
- Lease-Up Cash Flow: Rent Collected and the NOI Gap Locked
- Operating Costs per Unit and the Management Fee Locked
- Stabilised NOI: The Bridge from Gross Rent Locked
- Yield on Cost vs Exit Cap Rate: The Development Spread Locked
- Exit Value and Profit on Cost at Different Cap Rates Locked
- Amenity Spend vs Rent Premium: Annualised with PMT Locked
- Sensitivity Table: Rent × Build Cost Locked
- Cash Flow and the Unlevered IRR Locked
- Risk Scenarios: Cost Overrun, Lower Rents and Delay Locked
- Final Project: The Build-to-Rent Dashboard Locked